Baradene College Gymnasium
Client: Watts & Hughes Construction
System: StormLite® Underground Detention System
Total Capacity: 56,400 L
Project Overview
Watts & Hughes Construction partnered with APD to deliver a stormwater detention system for the new gymnasium at Baradene College.
The original design called for four joined StormLite® tanks (4 × 12,700 L) installed under a landscaped lawn area, providing a combined storage capacity of 50,800 L.
After the tanks were ordered, the project scope changed — the school decided to build a car park directly above the tank area.
This change introduced several structural and engineering challenges:
APD proposed an alternative configuration — three longer StormLite® tanks — which reduced the overall system width while maintaining structural integrity for the concrete slab above.
Two additional design adaptations were required:
Final configuration:
3 × 18,800 L StormLite® tanks (1,200 mm dia × 17 m long)
Total capacity: 56,400 L
Through careful redesign and collaboration with the engineering team, APD delivered a cost-efficient and structurally compliant solution.
The revised configuration enabled the car park construction to proceed safely above the installation — without increasing the project’s footprint or significantly impacting cost.
This project demonstrates APD’s ability to adapt designs quickly while maintaining compliance, performance, and client confidence.
“You have been exceptional to work with… extremely pragmatic, refreshing.
Simply put, for suppliers like yourself and APD — this is how you obtain repeat business.”