As part of the refurbishment project at the Tepid Baths in Auckland, APD was contracted by Trak Ltd to fabricate and install rectangular PVC Ducting for the exhaust side of the HVAC system.

Compliance

The Ducting was constructed in accordance with the SMACNA ducting standard and ranged in size from 300mm x 250mm up to 1200mm x 1000mm and was made in 6mm material with all joints being flanged connections. In total, over 100 metres of Ducting was fabricated and installed.

Features

  • Custom design.
  • Custom fabrication.
  • Install.