This project was a replacement Tank and Frame for the existing 5 tanks. APD designed a single replacement Tank with internal baffles to form weirs, to allow the sediment to settle and be refined at a later date. APD also designed the supporting frame, removed the existing tank set up and installed the tank and frame and new pipework to suit.
Subscribe for regular updates, your email address is required for subscription.