HazSure® IL4 Tanks for Pukete Wastewater Plant

Two HazSure IL4 HDPE tanks strapped side by side on a trailer at the Pukete Wastewater Treatment Plant
Taped side inspection port on a HazSure HDPE tank, redesigned by APD to comply with BS EN 12573
A 30,000 litre HazSure HDPE tank craned above a trailer at APD's Wiri workshop, with two workers guiding the lift
Close-up of the engineered elbow nozzles on the roof of a HazSure HDPE tank
Two HazSure HDPE service water tanks installed on the concrete pad under the canopy at the Pukete inlet works
Two HazSure HDPE tanks installed under a steel canopy at the completed Pukete inlet works, with site plant on the forecourt

On the Pukete Wastewater Treatment Plant inlet works in Hamilton, where Importance Level 4 requirements demanded certified seismic and structural performance, APD delivered two custom HazSure® HDPE tanks totalling 60,000 L, redesigning the tank openings before fabrication after its engineering review found the issued drawings breached BS EN 12573.

Project Quick Facts:

  • Client/Partner: McConnell Dowell, delivering the inlet works upgrade for Hamilton City Council.
  • The Challenge: Two 30,000 L service water tanks for an Importance Level 4 (IL4) facility, requiring verification for seismic loading and long-term structural performance, with all penetrations and anchor points integrating with the surrounding pipework and civil infrastructure.
  • The Solution: APD HazSure® custom HDPE tanks, engineered and certified to IL4 through independent Chartered Engineer PS1 assessment.
  • Key Spec: 60,000 litres of total service water storage across two tanks for this project, certified to IL4 for a Site Class D site.

The Challenge:

McConnell Dowell required two custom 30,000 L HDPE service water tanks for the Pukete inlet works, part of a municipal infrastructure upgrade for Hamilton City Council. As part of an IL4 facility, the tanks needed verification for seismic loading and long-term structural performance.

This project required engineering coordination far exceeding standard storage tank specifications. Every nozzle, inspection opening, and anchor location had to integrate seamlessly with the civil infrastructure and mechanical pipework. Achieving PS1 certification demanded close, continuous collaboration with McConnell Dowell and a Chartered Engineer.

During our internal engineering review, APD identified a critical compliance discrepancy in the original project specifications detailing the side inspection ports. Manufacturing to the initial specifications would have resulted in non-compliant assets. Consultation was made with the client and Chartered Engineer where the design was engineered to achieve compliance.

The APD Solution

  • Openings designed to comply: By proactively addressing a compliance issue with the side-entry inspection ports specified by the end Client, APD developed a compliant alternative. Our team engineered a solution that met strict regulatory standards while completely satisfying the Chartered Engineer’s concerns.
  • Engineered for IL4 loading: Heavy-duty PE100 construction with site specific seismic hold-down systems, roof support rings, barrel sleeves and engineered nozzle reinforcement.
  • Late revisions: When the client issued late-stage piping revisions, APD immediately paused production, updated all engineering models, and reissued the revised documentation for approval.

Technical Specifications

Attribute Specification
System type Custom HDPE tank (HazSure®)
Application Service water storage (filtered river water), wastewater treatment inlet works
Total Safe Working Volume 60,000 litres
Tanks per site Two
Material UV stabilised HDPE PE100
Diameter (Internal) 3500 mm
Operating liquid height 3118 mm
Design temperature 30°C
Design pressure +0.5 / -0.3 kPa
Importance Level IL4
Seismic design Site Class D with engineered hold-down restraint system
Construction standards BS EN 12573, EN 1778, SWI 2017, Health and Safety at Work (Hazardous Substances) Regulations 2017, AS/NZS 1170, NZSEE
Verification Independent PS1
Design life 25 years

Project Outcome and Performance

APD delivered two custom 30,000-litre storage tanks for the Pukete Wastewater Treatment Plant, meeting all municipal structural and earthquake safety requirements.

APD identified a compliance discrepancy regarding the side-entry inspection ports in the original specification documents. After reviewing the issue with the Client and Chartered Engineer, APD resolved their engineering concerns, ensuring the final assets met all safety regulations before manufacturing began.

When the client later issued late-stage piping changes, APD reissued documentation and secured immediate approval. This fast-tracked adjustment ensured the tanks met the target delivery date.

Frequently Asked Questions

What happens if the project specifications conflict with the standards?

  • Design Review: As soon as the discrepancy is identified during the design review, stakeholders are engaged
  • Stakeholders are consulted: The team immediately raises the issue with the client and the certifying Chartered Engineer to review the conflicting requirements.
  • The system is re-engineered: A compliant design is developed that satisfies both the technical needs of the project and the strict safety standards.
  • Approval is secured before manufacturing: Fabrication only commences once the solution is formally approved by the Chartered Engineer, ensuring the final product meets all safety regulations from day one.

How are HDPE tanks certified for Importance Level 4 infrastructure?

Through independent verification. The Pukete tanks were validated by an independent Chartered Engineer PS1 assessment, covering seismic loading and long-term structural performance for a Site Class D site.

Can APD accommodate design changes after fabrication has started?

Yes. When late piping revisions were issued at Pukete, APD froze production at the fittings stage, updated all CAD models and STEP files, and reissued drawings for approval. The updated documentation was fast tracked, so the changes went through without delaying fabrication.

What are custom HDPE tanks for wastewater infrastructure made from?

The Pukete tanks were built from HDPE PE100 (black).