Call our team on 09 263 7741

Worth & Douglas Settling Tank & Frame

Description

This project was a replacement Tank and Frame for the existing 5 tanks. APD designed a single replacement Tank with internal baffles to form weirs, to allow the sediment to settle and be refined at a later date. APD also designed the supporting frame, removed the existing tank set up and installed the tank and frame and new pipework to suit.

Features

  • Replaced 5 tanks with 1
  • Designed supporting frame
Previous When Gravity is an issue

Products Used

Browse Case Studies

Similar Case studies